Monday, April 11, 2011

Culinary Letter Of Recommendation

with DC power (I)

Cambios en la morfología municipal

Llega la hora del análisis de sus actuaciones en estos 8 años pues se acerca la hora del juicio que los ciudadanos han de hacer a estos últimos cuatro años, que podemos ampliar a ocho ya que son éstos los que han estado en el poder y gobierno municipal.

IPS analyze and recall the main nationalist government actions in different fields. The first analysis will be on the physical changes experienced by San Andrés y Sauces.


In this field we assess negatively the changes since they were the vast majority of projects implemented when CC were entered or infrastructure that have not been for nothing at the moment.


Investment in public works and infrastructure has been reduced to a minimum , except in the case of litorial where the Central Government has brought the beach and promenade promised . While the Hall of Nature of the Cabildo and the hostel , also from the central government, are but as if they were as little use or none of them does.

Thus the balance of these 8 years in this field is nothing but a social center in the hills and another in the greyhound, the latter initiated by the Socialists. Another important socialist project, the buildings parking , also initiated by them, has been completed with the nationalists in power, but is underused and without entering operation, which also can say the Day Centre, another socialist project in these 8 years that CC has raised money from the council, but still completed and become operational. If value is placed on another project initiated by the PSOE and completed by CC as the Occupational Center The Tisera , where the council sought finanaciación to complete. And the City Council in 2007 gave them the blessing of the opening of the reservoir of The greyhound.


therefore suspended for the works council, which has not functioned as in the past decade and whose work, not in four years but eight, is limited to asphalt track and shoot down some of the Cal Oven Puerto Espindola. Promises like square of the Biosphere, the leisure complex and marine park Lime Kiln, the development of the area or Sleeping Macho Park The Gates have run even worse luck and have promised that if been forgotten, not mislead the subsidized housing , to be discussed in another chapter.

But what is worse, all the above named, the vast majority took place in first term, so that the corresponding to the four years 2007-2011, to be regarded as ridiculous and ruinous .

obvious at this point work on the avenue and street until Bajamar, because even the municipality owns the project, as has been said from there. Therefore have no fault or merit of what is happening in it. External financing and local ignorance (remember that the vast majority of citizens do not know your route and final configuration).


And you, citizens of San Andrés y Sauces how do you assess the management of local government in this field over the years?

0 comments:

Post a Comment